Document
Cost & Burden Calculation Tables
ICR 202607-2060-003 · OMB 2060-0685 · Object 171241400.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Cost & Burden Calculation Tables |
| Author | Noel Hilliard |
| Last Modified By | Calc |
| File Modified | 2025-05-08 |
| File Created | 2026-08-01 |
| Conversion State | complete |
Extracted Text
ICR Summary Information Hours per Response 7 Number of Respondents 56 Total Estimated Burden Hours 1,550 Total Estimated Costs $212,000 Annualized Capital O&M $0 Total Annual Responses 224 Form Number Not Applicable Table 1: Annual Respondent Burden and Cost - NSPS for GHG Emissions for Newly Constructed, Modified, a (A) Hours per Occurrence 1. Applications 2. Survey and studies 3. Acquisition, installation, and utilization of technical systems 4. Reporting Requirements A. Familiarization with regulatory requirements b Existing Facilities 8 New Facilities 30 B. Required activities Notification of construction 2 Notification of startup 2 C. Create information D. Gather existing information E. Prepare/Submit Emissions Summary Report Includes reporting of excess emissions & downtime See 4E See 4E 4 Reporting Subtotal 5. Recordkeeping requirements Recordkeeping Subtotal d TOTAL LABOR BURDEN AND COST (rounded) e TOTAL CAPITAL AND O&M COSTS (rounded) e GRAND TOTAL (rounded)e See 4A-E Assumptions a We have assumed there are approximately 56 existing sources and no new sources per year anticipated over the nex b Assumes one-time burden of 30 hours for new sources to read and understand rule requirements. Assumes existing r This ICR uses the following labor rates: Managerial $172.41 ($82.10+ 110%); Technical $141.75 ($67.50 + 110%) of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group percent to account for varying industry wage rates and the additional overhead business costs of employing workers b training, and equipping their employees. This ICR assumes that Managerial hours are 5 percent of Technical hours, a c d All recordkeeping burden is accounted for in the listed reporting activities. e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. for Newly Constructed, Modified, and Reconstructed EGUs (40 CFR Part 60, Subpart TTTT) (Renewal) 141.75 (B) Occurrences/ Respondent/ Year 172.41 71.36 (C) Hours/ Respondent/ Year (D) (E) Technical (F) Respondents/ Hours/Year Managerial Yeara Hours/Year (G) Clerical Hours/Year (A x B) (C x D) (E x .05) (E x .10) 1 8 56 448 22 45 1 30 0 0 0 0 1 2 0 0 0 0 1 2 0 0 0 0 4 16 56 896 45 90 1,546 0 1,550 urces per year anticipated over the next 3 years, resulting in overall average of 56 respondents per year. rule requirements. Assumes existing respondents will spend 8 hours to refamiliarize with the regulatory requirements each year. ); Technical $141.75 ($67.50 + 110%); and Clerical $71.36 ($33.98 + 110%). These rates are from the United States Department rs by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates are increased by 110 business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, urs are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. y due to rounding. (H) Cost/ Yearc $70,562.91 $0.00 $0.00 $0.00 $141,125.82 $211,689 $0 $212,000 $0 $212,000 7 hrs/response . ry requirements each year. United States Department s are increased by 110 sociated with hiring, Table 2: Average Annual EPA Burden and Cost - NSPS for GHG Emissions for Newly Constructed, Burden Item Notification of construction Notification of startup Review Emissions Summary Report Includes reporting of excess emissions & downtime GRAND TOTAL (rounded)c Assumptions a We have assumed there are approximately 56 existing sources and no new sources per year anticipated ov This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to acc b percent of Technical hours, and Clerical hours are 10 percent of Technical hours. c Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. or Newly Constructed, Modified, and Reconstructed EGUs (40 CFR Part 60, Subpart TTTT) (Renewal) 57.07 76.91 30.88 Year (C) Hours/ Respondent/ Year (A x B) 1 1 1 0 0 0 0 1 1 1 0 0 0 0 4 4 16 56 896 45 90 (A) Hours per Occurrence (B) Occurrences/ Respondent/ (H) (D) (F) (G) Clerical Respondents/ Technical Managerial Hours/Yea Yeara Hours/ Year Hours/ Year r (C x D) (E x .05) (E x .10) 1,030 s per year anticipated over the next 3 years, resulting in overall average of 56 respondents per year. (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and Clerical $30.88 (GS-6, Step 3, $19.30+ nd Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2024 sed by 60 percent to account for the benefit packages available to government employees. This ICR assumes that Managerial hours are e to rounding. (I) Cost/ Yearb $0 $0 $57,347 $57,300 S-6, Step 3, $19.30+ ment (OPM), 2024 that Managerial hours are 5 The only type of industry costs associated with the information collection activity in the regulations are labor cost egulations are labor costs. There are no capital/startup or operation and maintenance costs for this ICR. Total Annual Responses (C) (A) (B) (D) Number of Existing Respondents That Keep Records But Do Not Submit Reports Information Collection Activity Number of Respondents Number of Responses Prepare/Submit Emissions Summary Report 56 4 0 Notification of construction 0 1 0 Notification of startup 0 1 0 Total (E) Total Annual Responses E=(BxC) +D 224 0 0 224 Number of Respondents Respondents That Submit Reports 1 Respondents That Do Not Submit Any Reports (A) (B) (C) Number of Existing Respondents that keep records but do not submit reports (D) Year Number of New Respondents 1 Number of Existing Respondents 1 0 56 0 0 2 0 56 0 0 3 0 56 0 0 Average 0 56 0 0 Number of Existing Respondents That Are Also New Respondents New respondents include sources with constructed, reconstructed and modified affected facilities. (E) Number of Respondents (E=A+B+C-D) 56 56 56 56