OMB control number

30 CFR 250, subpart H, Oil and Gas Production Safety Systems

OMB 1014-0003 ยท DOI/BSEE.

OMB 1014-0003

The Bureau of Safety and Environmental Enforcement (BSEE) proposes to amend the regulations regarding oil and natural gas production to address certain overly burdensome requirements. BSEE has identified specific revisions that would reduce the burden oil and natural gas operators on the outer continental shelf (OCS), without reducing safety or protection of the environment.

The latest form for 30 CFR 250, subpart H, Oil and Gas Production Safety Systems expires 2028-12-31 and is listed under ICR 202410-1014-003.

Latest Forms, Documents, and Supporting Material

Latest forms, documents, and information collections
DocumentType
2025-09583.pdf Supplementary Document
1014-0003-SS-2025.docxSupporting Statement A
1014-0003 published 8.30.24 [89 FR 70664] exp. 10.29.24.pdf Supplementary Document
30 USC 1751_ Secretarial authority.html (document unavailable) Supplementary Document
31 USC 9701_ Fees and charges for Government services and things of value.html Supplementary Document
43 USC CHAPTER 29, SUBCHAPTER III_ OUTER CONTINENTAL SHELF LANDS.html Supplementary Document
250.890(c) - Submit contact list or revised Information collection
250.890(a), (b) - Maintain SSS records 5 yrs Information collection
24 months Information collection
250.880(a)(3) - Notify prior to performing modifications Information collection
250.876 - Doc & Retain 5 yrs tube-type heater Information collection
250.874(h)(2) - Request approval to inject Information collection
250.874(g)(3) - Submit subsea shutdown capability Information collection
250.870(a) - Document PSL Information collection
250.867(c) - Request approval temp equipment Information collection
250.867(b) - Submit temp firewater supporting info. Information collection
250.867(a) - Request Approval safety system/device Information collection
250.864 - Maintain erosion records Information collection
250.861(b) - Annual Inspection of foam concentrates Information collection
250.860(d) - Changes made after approval Information collection
250.859(c); 860(b), (c); related NTL(s) - Request Approval / chemical only fire Information collection
250.859(a)(3), (4) - Post Diagram of firefighting system Information collection
250.858(a)(3) - Request Approval to use different procedure Information collection
250.855(b) - Maintain ESD schematic listing Information collection
250.855(a) - Identify all EDS stations Information collection
250.852(e)(1) - Review DMV Report Information collection
250.852(c)(2) - PSV Information collection
250.852(c)(1) - Request Approval to vent other location Information collection
250.851(c)(2) - Request approval - less than 5 psi Information collection
250.851(b); 852(a)(2), (3); 858(b); 865(b) - Maintain pressure-recorder info. Information collection
250.851(a)(2) - Request Approval / Uncoded pressure vessels Information collection
250.842(e) - Maintain design & installation records Information collection
250.842(d) - Certification Letter Information collection
250.842(c) - Hazard Analysis Information collection
250.842 - Submit Modification - < 25 components Information collection
250.842 - Submit Modification - 25-125 components Information collection
125 components Information collection
250.842 - Submit Application - < 25 components Information collection
250.842 - Submit Application - 25-125 components Information collection
125 components Information collection
250.838(c)(3) - Request approval produce after loss of comm. Information collection
250.838(a)(2); 839(a)(2) - Verify closure time Information collection
250.837(b)(2); (c)(2) - Obtain approval to resume production Information collection
250.837(a) - Request Approval to not shut-down Information collection
250.831 - Submit Repair/Replacement plan Information collection
250.831; 833(a), (b); 837(c)(5); 838(c); 874(g)(2), (h)(1) - Various Notifications Information collection
250.810; 816; 830 - Verify no-flow condition Information collection
250.810; 816; 830 - Submit request / incapable of nature flow Information collection
250.841(b) - Request approval of temporary repairs Information collection
250.814(a); 815(b); 828(a); 829(b) - Request Approval for setting depth when conditions warrant Information collection
250.803(c), (d) - Submit Modified Procedures Information collection
250.803(b), (d) - Document/Determine the results of SPPE failure Information collection
250.803(a), (d) - Written notice of Equipment Failure Information collection
250.802(c)(5), (e) - Document and Retain SPPE Information collection
250.802(c)(1) - Maintain description of Process Information collection
250.801(c); 802(c)(1) - 3rd Party Costs for Review Information collection
250.801(c) - Request evaluation Information collection
250.800(a); 880(a)(1), (2) - Request Approval Information collection

All Historical Document Collections

OMB Details

250.800(a); 880(a)(1), (2) - Request Approval

Federal Enterprise Architecture: Energy - Energy Production