Information Collection Request

30 CFR 250, subpart H, Oil and Gas Production Safety Systems

ICR 202410-1014-003 · OMB 1014-0003 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
2025-09583.pdf Supplementary Document Uploaded 2025-05-29 Repair queued
1014-0003-SS-2025.docx Supporting Statement A Uploaded 2025-04-03 Repair queued
1014-0003 published 8.30.24 [89 FR 70664] exp. 10.29.24.pdf Supplementary Document Uploaded 2025-04-03 Repair queued
30 USC 1751_ Secretarial authority.html Supplementary Document Uploaded 2025-04-03 Repair queued
31 USC 9701_ Fees and charges for Government services and things of value.html Supplementary Document Uploaded 2025-04-03 Repair queued
43 USC CHAPTER 29, SUBCHAPTER III_ OUTER CONTINENTAL SHELF LANDS.html Supplementary Document Uploaded 2025-04-03 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
250222 250.890(c) - Submit contact list or revised Modified
250221 250.890(a), (b) - Maintain SSS records 5 yrs Modified
250220 24 months Modified
250219 250.880(a)(3) - Notify prior to performing modifications Modified
250218 250.876 - Doc & Retain 5 yrs tube-type heater Modified
250217 250.874(h)(2) - Request approval to inject Modified
250216 250.874(g)(3) - Submit subsea shutdown capability Modified
250215 250.870(a) - Document PSL Modified
250214 250.867(c) - Request approval temp equipment Modified
250213 250.867(b) - Submit temp firewater supporting info. Modified
250212 250.867(a) - Request Approval safety system/device Modified
250211 250.864 - Maintain erosion records Modified
250210 250.861(b) - Annual Inspection of foam concentrates Modified
250209 250.860(d) - Changes made after approval Modified
250208 250.859(c); 860(b), (c); related NTL(s) - Request Approval / chemical only fire Modified
250207 250.859(a)(3), (4) - Post Diagram of firefighting system Modified
250206 250.858(a)(3) - Request Approval to use different procedure Modified
250205 250.855(b) - Maintain ESD schematic listing Modified
250204 250.855(a) - Identify all EDS stations Modified
250203 250.852(e)(1) - Review DMV Report Modified
250202 250.852(c)(2) - PSV Modified
250201 250.852(c)(1) - Request Approval to vent other location Modified
250200 250.851(c)(2) - Request approval - less than 5 psi Modified
250199 250.851(b); 852(a)(2), (3); 858(b); 865(b) - Maintain pressure-recorder info. Modified
250198 250.851(a)(2) - Request Approval / Uncoded pressure vessels Modified
250197 250.842(e) - Maintain design & installation records Modified
250196 250.842(d) - Certification Letter Modified
250195 250.842(c) - Hazard Analysis Modified
250194 250.842 - Submit Modification - < 25 components Modified
250193 250.842 - Submit Modification - 25-125 components Modified
250192 125 components Modified
250191 250.842 - Submit Application - < 25 components Modified
250190 250.842 - Submit Application - 25-125 components Modified
250188 125 components Modified
250186 250.838(c)(3) - Request approval produce after loss of comm. Modified
250185 250.838(a)(2); 839(a)(2) - Verify closure time Modified
250184 250.837(b)(2); (c)(2) - Obtain approval to resume production Modified
250183 250.837(a) - Request Approval to not shut-down Modified
250182 250.831 - Submit Repair/Replacement plan Modified
250181 250.831; 833(a), (b); 837(c)(5); 838(c); 874(g)(2), (h)(1) - Various Notifications Modified
250180 250.810; 816; 830 - Verify no-flow condition Modified
250179 250.810; 816; 830 - Submit request / incapable of nature flow Modified
250178 250.841(b) - Request approval of temporary repairs Modified
250177 250.814(a); 815(b); 828(a); 829(b) - Request Approval for setting depth when conditions warrant Modified
250176 250.803(c), (d) - Submit Modified Procedures Modified
250175 250.803(b), (d) - Document/Determine the results of SPPE failure Modified
250174 250.803(a), (d) - Written notice of Equipment Failure Modified
250173 250.802(c)(5), (e) - Document and Retain SPPE Modified
250172 250.802(c)(1) - Maintain description of Process Modified
250171 250.801(c); 802(c)(1) - 3rd Party Costs for Review Modified
250170 250.801(c) - Request evaluation Modified
250169 250.800(a); 880(a)(1), (2) - Request Approval Modified
ICR Details
1014-0003 202410-1014-003
Received in OIRA 202108-1014-001
DOI/BSEE 1014-0003 ext. '25
30 CFR 250, subpart H, Oil and Gas Production Safety Systems
Extension without change of a currently approved collection   No
Regular 05/29/2025
  Requested Previously Approved
36 Months From Approved 07/31/2025
7,454 7,454
91,250 95,488
11,455,906 10,547,442

The Bureau of Safety and Environmental Enforcement (BSEE) proposes to amend the regulations regarding oil and natural gas production to address certain overly burdensome requirements. BSEE has identified specific revisions that would reduce the burden oil and natural gas operators on the outer continental shelf (OCS), without reducing safety or protection of the environment.

US Code: 31 USC 9701 Name of Law: Independent Offices Appropriations Act
   US Code: 43 USC 1331 Name of Law: Outer Continental Shelf Lands Act
   US Code: 30 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
  
None

Not associated with rulemaking

  89 FR 70664 08/30/2024
90 FR 22754 05/29/2025
Yes

52
IC Title Form No. Form Name
250.800(a); 880(a)(1), (2) - Request Approval
250.801(c) - Request evaluation
250.801(c); 802(c)(1) - 3rd Party Costs for Review
250.802(c)(1) - Maintain description of Process
250.802(c)(5), (e) - Document and Retain SPPE
250.803(a), (d) - Written notice of Equipment Failure
250.803(b), (d) - Document/Determine the results of SPPE failure
250.803(c), (d) - Submit Modified Procedures
250.810; 816; 830 - Submit request / incapable of nature flow
250.810; 816; 830 - Verify no-flow condition
250.814(a); 815(b); 828(a); 829(b) - Request Approval for setting depth when conditions warrant
250.831 - Submit Repair/Replacement plan
250.831; 833(a), (b); 837(c)(5); 838(c); 874(g)(2), (h)(1) - Various Notifications
250.837(a) - Request Approval to not shut-down
250.837(b)(2); (c)(2) - Obtain approval to resume production
250.838(a)(2); 839(a)(2) - Verify closure time
250.838(c)(3) - Request approval produce after loss of comm.
250.841(b) - Request approval of temporary repairs
250.842 - Submit Application - 25-125 components
250.842 - Submit Application - < 25 components
250.842 - Submit Application - >125 components
250.842 - Submit Modification - 25-125 components
250.842 - Submit Modification - < 25 components
250.842 - Submit Modification - > 125 components
250.842(c) - Hazard Analysis
250.842(d) - Certification Letter
250.842(e) - Maintain design & installation records
250.851(a)(2) - Request Approval / Uncoded pressure vessels
250.851(b); 852(a)(2), (3); 858(b); 865(b) - Maintain pressure-recorder info.
250.851(c)(2) - Request approval - less than 5 psi
250.852(c)(1) - Request Approval to vent other location
250.852(c)(2) - PSV
250.852(e)(1) - Review DMV Report
250.855(a) - Identify all EDS stations
250.855(b) - Maintain ESD schematic listing
250.858(a)(3) - Request Approval to use different procedure
250.859(a)(3), (4) - Post Diagram of firefighting system
250.859(c); 860(b), (c); related NTL(s) - Request Approval / chemical only fire
250.860(d) - Changes made after approval
250.861(b) - Annual Inspection of foam concentrates
250.864 - Maintain erosion records
250.867(a) - Request Approval safety system/device
250.867(b) - Submit temp firewater supporting info.
250.867(c) - Request approval temp equipment
250.870(a) - Document PSL
250.874(g)(3) - Submit subsea shutdown capability
250.874(h)(2) - Request approval to inject
250.876 - Doc & Retain 5 yrs tube-type heater
250.880(a)(3) - Notify prior to performing modifications
250.880(d)(1) - Request approval to exceed > 24 months
250.890(a), (b) - Maintain SSS records 5 yrs
250.890(c) - Submit contact list or revised

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 7,454 7,454 0 0 0 0
Annual Time Burden (Hours) 91,250 95,488 0 0 -4,238 0
Annual Cost Burden (Dollars) 11,455,906 10,547,442 0 0 908,464 0
No
No
Current subpart H regulations have 95,488 hours approved. This ICR requests a total of 91,250 burden hours; resulting in an adjustment decrease of -4,238 hours. The adjustment decrease is a result of hourly input we received from Industry Outreach. All the different reporting and recordkeeping requirements that are listed in the Subpart H burden table (Section A.12) were thoroughly reviewed by the company representatives listed in A.8. All changes to burden hours are shown in bold in A.12 The current OMB approved non-hour cost burden for subpart H is $10,547,442. In this submission, we are requesting $11,455,906; resulting in an adjustment increase of $908,464. This increase is a result of input we received from Industry Outreach, including all the Professional Engineering costs in § 250.842 have gone up. All the different reporting and recordkeeping requirements that are listed in the Subpart H burden table (Section A.12) were thoroughly reviewed by the company representatives listed in A.8. All changes are shown in bold in A.12

$4,106,250
No
    No
    No
No
No
No
No
Kelly Odom 703 787-1775 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/29/2025