Document

10 CFR Part 52 - Supporting Statement Burden Excel Charts

ICR 201311-3150-004 · OMB 3150-0151 · Object 43264102.

Document Viewer [xlsx]

Status: Original and derived artifacts are available for this document.

Download: xlsx | pdf | html

Primary: spreadsheetSource: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Loading document viewer…
Document Metadata
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Title10 CFR Part 52 - Supporting Statement Burden Excel Charts
AuthorGeorge Tartal
Last Modified ByCalc
File Modified2014-05-13
File Created2026-06-19
Conversion Statecomplete
Extracted Text
TABLE 1
ANNUAL REPORTING BURDEN
10 CFR PART 52
GENERAL PROVISIONS
Section

Number of
Respondents
Annually

Responses per
Respondent
Annually

52.7 (Respondent is same as in Subpart C below. Only one exemption is expected to be requested annually)

1

Subtotal: General Provisions

1

Total Responses
Annually
1

Burden per
Response
1

Total Annual
Burden Hours

360

1

Estimate Annual
Cost @ $274/hr

360

$98,640

360

$98,640

SUBPART A: EARLY SITE PERMITS (ESPs)
NRC expects 0 ESP applications over the next 3 years.
52.15(b) – Burden covered under 10 CFR 50.30(a), (b), and (f), approved by OMB under Clearance No. 31500011.
52.16 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33(j), approved by OMB under Clearance No.
3150-0011
52.17(a)(1)
52.17(a)(2) – Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021
52.17(b)(1)
52.17(b)(2)(i) and 52.17(b)(3) without ITAAC
52.17(b)(2)(i) and 52.17(b)(3) with ITAAC
52.17(b)(2)(ii) and 52.17(b)(3)
52.17(b)(4)
52.17(c) – Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

0
0
0
0
0
0
0
n/a

1
1
1
0
0
1
1
n/a

0
0
0
0
0
0
0
n/a

6,000
60
20
1,000
2,667
2,000
40
n/a

0
0
0
0
0
0
0
n/a

$0
$0
$0
$0
$0
$0
$0
n/a

52.29(a)
52.35
52.39(b) – Burden covered under 10 CFR 52.79(b)

0
0
n/a

0
0
n/a

0
0
n/a

6,000
40
n/a

0
0
n/a

$0
$0
n/a

52.39(d)
52.39(e) – Burden covered under 10 CFR 50.90, approved by OMB Clearance No. 3150-0011

0
n/a

1
n/a

0
n/a

120
n/a

0
n/a

$0
n/a

0
8,180
-8,180

$0

Subtotal: Subpart A

0

0
2010
Delta

SUBPART B: STANDARD DESIGN CERTIFICATIONS (DCs)
NRC expects 4 DC applications over the next 3 years. (mPower, NuScale, Westinghouse SMR, APR1400 (4/3=1.3333)
Section

52.45 – Burden covered under 10 CFR 52.46 and 52.47

Number of
Respondents
Annually

Responses per
Total Responses
Respondent
Annually
Annually
n/a
n/a
n/a

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

1.333

1

1.333

35,300

47,055

$12,893,043

n/a

n/a

n/a

n/a

n/a

n/a

52.47(a)(27)

1.333

1

1.333

45,400

60,518

$16,581,987

52.47(b)(1)

1.333

1

1.333

25,300

33,725

$9,240,623

n/a
n/a
n/a
n/a
0

n/a
n/a
n/a
n/a
0

n/a
n/a
n/a
n/a
0

n/a
n/a
n/a
n/a
10,000

n/a
n/a
n/a
n/a
0

n/a
n/a
n/a
n/a
$0

n/a

n/a

n/a

n/a

52.46 – Burden covered under 10 CFR 50.33 (a) – (c) and 50.33 (j), approved by OMB under Clearance No.
3150-0011
52.47 (a), except (a)(6) & (a)(27)
52.47(a)(6) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014

52.47(b)(2) – Burden covered under 10 CFR 51.55, approved by OMB under Clearance No. 3150-0021
52.47(c)(1) – Burden covered under 10 CFR 52.47(a) and 52.47(b)
52.47(c)(2) – Burden covered under 10 CFR 52.47(a) and 52.47(b)
52.51 – Burden covered under 10 CFR 52.47(a)
52.57(a)
52.63(b)(1) – Burden covered under 10 CFR 52.7
Subtotal: Subpart B

n/a

Burden per
Response

1.3333

3.999

n/a

n/a

141,298

$38,715,652

[1]

Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.

2010

141,298

delta

0

SUBPART C: COMBINED LICENSES (COLs)
NRC expects 0 COL applications over the next 3 years
1 COLs referencing DC applications (0.333 responses/year) and 0 referencing ESP applications (0 responses per year)
4 COLs under construction; 0 COLs in operation (refer to table 3, list of applicants)
NRC expects one uncompleted ITAAC notification and one all ITAAC complete notification over the next 3 years (1/3=0.3333)
Section
Number of
Responses per
Total Responses
Burden per
Respondents
Respondent
Annually
Response
Annually
Annually
n/a
n/a
n/a
n/a
52.75 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011
n/a
n/a
n/a
n/a
52.77 – Burden covered under 10 CFR 50.33, approved by OMB under Clearance No. 3150-0011
0
0
0
58,420
52.79(a), except (a)(45) & (a)(46) – COL that doesn’t reference any other Part 52 product
n/a
n/a
n/a
n/a
52.79(a)(45) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014
52.79(a)(46)
52.79(b) – COL that references an ESP
52.79(c) – COL that references a design approval
52.79(d) – COL that references a DC
52.79(e) – COL that references a manufactured reactor
52.79(b) & (d) – COL that references both an ESP and a DC
52.80(a) – 40,000 hours for applications which do not reference a DC
10,000 hours for applications that do not reference a certified design
52.80(b) – Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021
52.80(c) – Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011
52.93(a) – Burden covered under 10 CFR 52.7
52.93(b) – Burden covered under 10 CFR 52.39
52.93(c) – Burden covered under 10 CFR 52.171
52.99(a) - See Table 3
52.99(c)(1)- ITAAC Closure Notification
52.99(c)(2)- ITAAC Post-closure Notifications
52.99(c)(3)- Uncompleted ITAAC Notifications
52.99(c)(4)- All ITAAC Complete Notifications
52.99(d)(1) & 52.99(d)(2) – Burden covered under 10 CFR 52.39 (variances) and 52.7 (exemptions)
52.103(a)
52.110(a)
52.110(d)
52.110(g)
52.110(h)(3)
52.110(h)(4)
Subtotal: Subpart C

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
n/a
0
n/a

n/a
n/a
$0
n/a

0
0
0
0.3333

0
0
0
1

0
0
0
0.3333

54,000
102,368
46,460
31,460

0
0
0
10,486

$0
$0
$0
$2,873,059

0
0
0
0
n/a
n/a

0
1
0
0
n/a
n/a

0
0
0
0
n/a
n/a

36,460
26,560
40,000
10,000
n/a
n/a

0
0
0
0
n/a
n/a

$0
$0
$0
$0
n/a
n/a

n/a
n/a
n/a
4
4
4
0.33
0.33
n/a
0.33
0
0
0
0
0
13.3233

n/a
n/a
n/a
2
250
6
1
1
n/a
1
0
0
0
0
0

n/a
n/a
n/a
8
1000
24
0.33
0.33
n/a
0.33
0
0
0
0
0
1033.3233

n/a
n/a
n/a
20
40
20
40
8
n/a
10
20
3,000
20
20
20

n/a
n/a
n/a
160
40,000
480
13
3
n/a
3
0
0
0
0
0
51,145

n/a
n/a
n/a
$43,840
$10,960,000
$131,520
$3,617
$723
n/a
$904
$0
$0
$0
$0
$0
$14,013,664

2010
delta

41,396
9,749

SUBPART E: STANDARD DESIGN APPROVALS
NRC expects 0 design approval applications over the next 3 years.
Section

Number of
Respondents
Annually

52.135 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011

Responses per
Total Responses
Respondent
Annually
Annually
n/a
n/a
n/a
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a

n/a

n/a

n/a

n/a

n/a

n/a

52.136 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33 (j), approved by OMB under Clearance No.
3150-0011
52.137(a), except (a)(6) & (a)(25)

n/a
0

0

0

42,000

0

$0

52.137(a)(6) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014

n/a

n/a

n/a

n/a

n/a

n/a

52.137(a)(25)

0

0

0

54,000

0

$0

Subtotal: Subpart E

0

0

0

0
2010

0

delta

0

SUBPART F: MANUFACTURING LICENSES
NRC expects 0 manufacturing license applications over the next 3 years.
Section

Number of
Respondents
Annually

52.155 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011
52.156 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33(j), approved by OMB under Clearance No.
3150-0011
52.157, except 52.157(f)(9) & (f)(31)
52.157(f)(9) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014
52.157(f)(31)
52.158(a)
52.158(b) – Burden covered under 10 CFR 51.54, approved by OMB under Clearance No. 3150-0021
52.171(b) – Burden covered under 10 CFR 50.90 & 50.91, approved by OMB under Clearance No 3150-0011
52.177
Subtotal: Subpart F

Responses per
Total Responses
Respondent
Annually
Annually
n/a
n/a
n/a
n/a
n/a
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
n/a

n/a
n/a

n/a
n/a

0
n/a

0
n/a

0
n/a

50,000
n/a

0
n/a

$0
n/a

0
0
n/a
n/a

0
0
n/a
n/a

0
0
n/a
n/a

54,000
30,000
n/a
n/a

0
0
n/a
n/a

$0
$0
n/a
n/a

0
0

0

0
0

10,000

0
0
0
0

$0
0

2010
delta

NRC expects to promulgate 3 DCRs over the next 3 years- US-APWR, EPR, ESBWR

Section

IX.A.2 – Burden covered under 10 CFR 52.99
X.B.1 - COL departures from DC

0
n/a

X.B.2 - COL DCD updates
X.B.3.c – Burden covered under X.B.1 and X.B.2

Section

IX.A.2 – Burden covered under 10 CFR 52.99
X.B.1
X.B.2
X.B.3.c – Burden covered under X.B.1 and X.B.2

X.B.2
X.B.3.c – Burden covered under X.B.1 and X.B.2

1
n/a

0
n/a

APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the System 80+ Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix B under construction over the next 3 years
Number of
Responses per
Total Responses
Respondents
Respondent
Annually
Annually
Annually
n/a
n/a
n/a
0
1
0
0
n/a

Section

IX.A.2 – Burden covered under 10 CFR 52.99
X.B.1

APPENDIX A: ABWR DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the ABWR Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix A under construction over the next 3 years
Number of
Responses per
Total Responses
Respondents
Respondent
Annually
Annually
Annually
n/a
n/a
n/a
0
1
0

1
n/a

0
n/a

APPENDIX C: AP600 DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the AP600 Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix C under construction over the next 3 years
Number of
Responses per
Total Responses
Respondents
Respondent
Annually
Annually
Annually
n/a
n/a
n/a
0
1
0
0
n/a

1
n/a

0
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
8

n/a
0

n/a
$0

500
n/a

0
n/a

$0
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
8

n/a
0

n/a
$0

500
n/a

0
n/a

$0
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
8

n/a
0

n/a
$0

500
n/a

0
n/a

$0
n/a

Section

IX.A.2 – Burden covered under 10 CFR 52.99
X.B.1

APPENDIX D: AP1000 DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the AP1000 Design Certification Rule over the next 3 years.
NRC expects 4 COLs referencing Appendix D under construction over the next 3 years
Number of
Responses per
Total Responses
Respondents
Respondent
Annually
Annually
Annually
n/a
n/a
n/a
4
2
8

X.B.2
X.B.3.c – Burden covered under X.B.1 and X.B.2
Subtotal: Appendices

[1]

Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.

4
n/a
4

1
n/a

4
n/a

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

n/a
8

n/a
64

n/a
$17,536

500
n/a

2,000
n/a

$548,000
n/a

2,064
0
2,064

$565,536

2010
delta

12

APPENDIX N: STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS:
COMBINED LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF IDENTICAL DESIGN AT MULTIPLE SITES
NRC expects 0 combined license applicants to use Appendix N over the next 3 years.
Section

Number of
Respondents
Annually

Responses per
Respondent
Annually

Total Responses
Annually

Burden per
Response

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

Paragraph 2

0

0

0

10

0

$0

Paragraph 3
Paragraph 4 – Burden covered under 10 CFR 52.80(c)
Subtotal: Appendix N

0

0

0

40

0

$0

0

$0

194,867
191,774
3,093

$53,393,492

Total Part 52 Reporting Burden

0

0

19.6566

1,050
2010
delta

TABLE 2
ANNUAL RECORDKEEPING BURDEN
10 CFR PART 52
recordkeepers under 52.63(b)(2) and 52.63(b) are noted as the same record keeper and are only counted once
Section

Number of Record Burden Hrs. per
keepers
Record keeper
7/3=2.333
0/3=0
(4/3=1.333)
2.333
500
0
500

52.47
52.57(a)-renewals
52.63(b)(2)
52.63(c) & 52.73(b)

1.333
1.333

1,500
500

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

1,167
0

$319,621
$0

2,000
667

$547,863
$182,621

APPENDIX A: ABWR DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the ABWR Design Certification Rule over the next 3 years.
Section
Number of Record Burden Hrs. per
keepers
Record keeper

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

X.A.1

1

34

34

$9,316

X.A.2 – Burden covered under 10 CFR 50.71(e)
X.A.3 – Burden covered under 10 CFR 50.59(d)
X.A.4.a - Burden approved under 3150-0210 *
X.A.4.b - Burden approved under 3150-0210 *

1
1

1
1

3
3

$822
$822

[1]
Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
* Burden covered under, U.S Advanced Boiling Water Reactor Aircraft Impact Design Certification
Amendment (3150-0210). Following the approval of this renewal, this clearance 3150-0210 will be
discontinued.

APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the System 80+ Design Certification Rule over the next 3 years.
Section
Number of Record Burden Hrs. per
keepers
Record keeper

X.A.1
X.A.2 – Burden covered under 10 CFR 50.71(e)
X.A.3 – Burden covered under 10 CFR 50.59(d)

1

34

Total Annual
Burden Hours

Estimate Annual
Cost @ $274/hr

34

$9,316

Section
2010 annual burden delta
52.47
666.5
500
52.57(a)-renewals
166.5
-167
52.63(b)(2)
8499
-6,500
52.63(c) & 52.73(b)
2833
-2,167

APPENDIX C: AP600 DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the AP600 Design Certification Rule over the next 3 years.
Section
Number of Record Burden Hrs. per
keepers
Record keeper

X.A.1

1

Total Annual
Burden Hours

34

Estimate Annual
Cost @ $274/hr

34

$9,316

X.A.2 – Burden covered under 10 CFR 50.71(e)
X.A.3 – Burden covered under 10 CFR 50.59(d)
APPENDIX D: AP1000 DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the AP1000 Design Certification Rule over the next 3 years.
Section
Number of Record Burden Hrs. per
keepers
Record keeper

X.A.1

1

Total Annual
Burden Hours

34

Estimate Annual
Cost @ $274/hr

34

$9,316

X.A.2 – Burden covered under 10 CFR 50.71(e)
X.A.3 – Burden covered under 10 CFR 50.59(d)
Total Part 52 Recordkeeping Burden
Total Storage Cost

9.666

3,975
$

10 CFR Part 52 Burden
Current
Total Number of Respondents:
Total Number of Responses:
Total Number of Recordkeepers:
Total Reporting Burden Hours:
Total Recordkeeping Burden Hours:
Total Burden Hours:
Total Cost:
[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.

20
1,050
10
194,867
3,975
198,842
$54,482,940

2010
20
67
11
192,830
12,325
205,155
$52,447,321

Delta
0
983.3223
-1
2036.758
-8350.5
(6,313)
$2,035,619

$1,089,013
435.61

TABLE 3
ANNUAL REPORTING BURDEN UNDER 10 CFR 52.99(a)
10 CFR PART 52
NOTE: BELLEFONTE, CALLAWAY, NINE MILE, GRAND GULF, RIVER BEND reviews suspended and removed
Licensee
2014
2015
South Texas (2 units)
N
N
Vogtle (2 units)
A
A
Lee (2 units)
N
N
Harris (2 units)
N
N
Summer (2 units)
A
A
Levy County (2 units)
N
N
Turkey Point (2 units)
N
N
Calvert Cliffs (1 unit)
N
N
Bell Bend (1 unit)
N
N
North Anna (1 unit)
N
N
Fermi (1 unit)
N
N
Comanche Peak (2 units)
N
N
Total Submittals
Model
Number of submittals per year per unit
Note: N = license not yet issued, A = license issued, Z = initial fuel load
Note: Continue ITAAC complete notifications 12 per year until notification of all ITAAC met
Note: Assumes that each unit will submit a separate report

0
Year A

0
Year A+1

1

2016
N
Z
N
N
A
N
N
N
N
N
N
N
0
Year A+2

2

Year Z-1
2

Year Z
12

Year Z+1
12

12

Reviews
CY
COLA
ESP
DCA
DCR

2014
6
2
4.5
2

Vogtle
Summer

Start Date
3/30/2012
3/30/2012

52.99[c][1]

V1

AP1000

2016
0
0
4.5
0.25

assumed 4 year
construction end

COLs under construction

Total

2015
2.5
1
5
2

3/30/2016
3/30/2016
V2

S3

S4

2014
50
2015
250
2016
600
2017 fuel load
2018
fuel load

100
200
400
200

100
200
400
200
fuel load fuel load

100
200
400
200

900

900

900

900

reports/yr
4 respondents

~900 ITAAC

52.99[c][2]

V1
V2
S3
S4
2014
6
6
6
2015
6
6
6
2016
6
6
6
2017
2018
NRC ESTIMATES SIX REPORTS PER LICENSEE PER YEAR OF
CONSTRUCTION

6
6
6

reports/yr
4 respondents

52.99 [c][3]

Vogtle 3 only potential schedule lag to miss fuel load

1/3=0.333

52.99 [c][4]

Vogtle 3 only plant scheduled for 103(g)

1/3=0.333

1000
250 per year

24
6 per year