Document
10 CFR Part 52 - Supporting Statement Burden Excel Charts
ICR 201311-3150-004 · OMB 3150-0151 · Object 43264102.
This document may belong to an older filing. More recent activity for OMB 3150-0151:
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | 10 CFR Part 52 - Supporting Statement Burden Excel Charts |
| Author | George Tartal |
| Last Modified By | Calc |
| File Modified | 2014-05-13 |
| File Created | 2026-06-19 |
| Conversion State | complete |
Extracted Text
TABLE 1 ANNUAL REPORTING BURDEN 10 CFR PART 52 GENERAL PROVISIONS Section Number of Respondents Annually Responses per Respondent Annually 52.7 (Respondent is same as in Subpart C below. Only one exemption is expected to be requested annually) 1 Subtotal: General Provisions 1 Total Responses Annually 1 Burden per Response 1 Total Annual Burden Hours 360 1 Estimate Annual Cost @ $274/hr 360 $98,640 360 $98,640 SUBPART A: EARLY SITE PERMITS (ESPs) NRC expects 0 ESP applications over the next 3 years. 52.15(b) – Burden covered under 10 CFR 50.30(a), (b), and (f), approved by OMB under Clearance No. 31500011. 52.16 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33(j), approved by OMB under Clearance No. 3150-0011 52.17(a)(1) 52.17(a)(2) – Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021 52.17(b)(1) 52.17(b)(2)(i) and 52.17(b)(3) without ITAAC 52.17(b)(2)(i) and 52.17(b)(3) with ITAAC 52.17(b)(2)(ii) and 52.17(b)(3) 52.17(b)(4) 52.17(c) – Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0 0 0 0 0 0 0 n/a 1 1 1 0 0 1 1 n/a 0 0 0 0 0 0 0 n/a 6,000 60 20 1,000 2,667 2,000 40 n/a 0 0 0 0 0 0 0 n/a $0 $0 $0 $0 $0 $0 $0 n/a 52.29(a) 52.35 52.39(b) – Burden covered under 10 CFR 52.79(b) 0 0 n/a 0 0 n/a 0 0 n/a 6,000 40 n/a 0 0 n/a $0 $0 n/a 52.39(d) 52.39(e) – Burden covered under 10 CFR 50.90, approved by OMB Clearance No. 3150-0011 0 n/a 1 n/a 0 n/a 120 n/a 0 n/a $0 n/a 0 8,180 -8,180 $0 Subtotal: Subpart A 0 0 2010 Delta SUBPART B: STANDARD DESIGN CERTIFICATIONS (DCs) NRC expects 4 DC applications over the next 3 years. (mPower, NuScale, Westinghouse SMR, APR1400 (4/3=1.3333) Section 52.45 – Burden covered under 10 CFR 52.46 and 52.47 Number of Respondents Annually Responses per Total Responses Respondent Annually Annually n/a n/a n/a Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a n/a n/a n/a n/a n/a n/a n/a 1.333 1 1.333 35,300 47,055 $12,893,043 n/a n/a n/a n/a n/a n/a 52.47(a)(27) 1.333 1 1.333 45,400 60,518 $16,581,987 52.47(b)(1) 1.333 1 1.333 25,300 33,725 $9,240,623 n/a n/a n/a n/a 0 n/a n/a n/a n/a 0 n/a n/a n/a n/a 0 n/a n/a n/a n/a 10,000 n/a n/a n/a n/a 0 n/a n/a n/a n/a $0 n/a n/a n/a n/a 52.46 – Burden covered under 10 CFR 50.33 (a) – (c) and 50.33 (j), approved by OMB under Clearance No. 3150-0011 52.47 (a), except (a)(6) & (a)(27) 52.47(a)(6) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 52.47(b)(2) – Burden covered under 10 CFR 51.55, approved by OMB under Clearance No. 3150-0021 52.47(c)(1) – Burden covered under 10 CFR 52.47(a) and 52.47(b) 52.47(c)(2) – Burden covered under 10 CFR 52.47(a) and 52.47(b) 52.51 – Burden covered under 10 CFR 52.47(a) 52.57(a) 52.63(b)(1) – Burden covered under 10 CFR 52.7 Subtotal: Subpart B n/a Burden per Response 1.3333 3.999 n/a n/a 141,298 $38,715,652 [1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements. 2010 141,298 delta 0 SUBPART C: COMBINED LICENSES (COLs) NRC expects 0 COL applications over the next 3 years 1 COLs referencing DC applications (0.333 responses/year) and 0 referencing ESP applications (0 responses per year) 4 COLs under construction; 0 COLs in operation (refer to table 3, list of applicants) NRC expects one uncompleted ITAAC notification and one all ITAAC complete notification over the next 3 years (1/3=0.3333) Section Number of Responses per Total Responses Burden per Respondents Respondent Annually Response Annually Annually n/a n/a n/a n/a 52.75 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a 52.77 – Burden covered under 10 CFR 50.33, approved by OMB under Clearance No. 3150-0011 0 0 0 58,420 52.79(a), except (a)(45) & (a)(46) – COL that doesn’t reference any other Part 52 product n/a n/a n/a n/a 52.79(a)(45) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 52.79(a)(46) 52.79(b) – COL that references an ESP 52.79(c) – COL that references a design approval 52.79(d) – COL that references a DC 52.79(e) – COL that references a manufactured reactor 52.79(b) & (d) – COL that references both an ESP and a DC 52.80(a) – 40,000 hours for applications which do not reference a DC 10,000 hours for applications that do not reference a certified design 52.80(b) – Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021 52.80(c) – Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011 52.93(a) – Burden covered under 10 CFR 52.7 52.93(b) – Burden covered under 10 CFR 52.39 52.93(c) – Burden covered under 10 CFR 52.171 52.99(a) - See Table 3 52.99(c)(1)- ITAAC Closure Notification 52.99(c)(2)- ITAAC Post-closure Notifications 52.99(c)(3)- Uncompleted ITAAC Notifications 52.99(c)(4)- All ITAAC Complete Notifications 52.99(d)(1) & 52.99(d)(2) – Burden covered under 10 CFR 52.39 (variances) and 52.7 (exemptions) 52.103(a) 52.110(a) 52.110(d) 52.110(g) 52.110(h)(3) 52.110(h)(4) Subtotal: Subpart C Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a n/a 0 n/a n/a n/a $0 n/a 0 0 0 0.3333 0 0 0 1 0 0 0 0.3333 54,000 102,368 46,460 31,460 0 0 0 10,486 $0 $0 $0 $2,873,059 0 0 0 0 n/a n/a 0 1 0 0 n/a n/a 0 0 0 0 n/a n/a 36,460 26,560 40,000 10,000 n/a n/a 0 0 0 0 n/a n/a $0 $0 $0 $0 n/a n/a n/a n/a n/a 4 4 4 0.33 0.33 n/a 0.33 0 0 0 0 0 13.3233 n/a n/a n/a 2 250 6 1 1 n/a 1 0 0 0 0 0 n/a n/a n/a 8 1000 24 0.33 0.33 n/a 0.33 0 0 0 0 0 1033.3233 n/a n/a n/a 20 40 20 40 8 n/a 10 20 3,000 20 20 20 n/a n/a n/a 160 40,000 480 13 3 n/a 3 0 0 0 0 0 51,145 n/a n/a n/a $43,840 $10,960,000 $131,520 $3,617 $723 n/a $904 $0 $0 $0 $0 $0 $14,013,664 2010 delta 41,396 9,749 SUBPART E: STANDARD DESIGN APPROVALS NRC expects 0 design approval applications over the next 3 years. Section Number of Respondents Annually 52.135 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 Responses per Total Responses Respondent Annually Annually n/a n/a n/a n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a n/a n/a n/a n/a n/a n/a 52.136 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33 (j), approved by OMB under Clearance No. 3150-0011 52.137(a), except (a)(6) & (a)(25) n/a 0 0 0 42,000 0 $0 52.137(a)(6) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 n/a n/a n/a n/a n/a n/a 52.137(a)(25) 0 0 0 54,000 0 $0 Subtotal: Subpart E 0 0 0 0 2010 0 delta 0 SUBPART F: MANUFACTURING LICENSES NRC expects 0 manufacturing license applications over the next 3 years. Section Number of Respondents Annually 52.155 – Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 52.156 – Burden covered under 10 CFR 50.33(a) – (d) and 50.33(j), approved by OMB under Clearance No. 3150-0011 52.157, except 52.157(f)(9) & (f)(31) 52.157(f)(9) – Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 52.157(f)(31) 52.158(a) 52.158(b) – Burden covered under 10 CFR 51.54, approved by OMB under Clearance No. 3150-0021 52.171(b) – Burden covered under 10 CFR 50.90 & 50.91, approved by OMB under Clearance No 3150-0011 52.177 Subtotal: Subpart F Responses per Total Responses Respondent Annually Annually n/a n/a n/a n/a n/a n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a n/a n/a n/a n/a n/a 0 n/a 0 n/a 0 n/a 50,000 n/a 0 n/a $0 n/a 0 0 n/a n/a 0 0 n/a n/a 0 0 n/a n/a 54,000 30,000 n/a n/a 0 0 n/a n/a $0 $0 n/a n/a 0 0 0 0 0 10,000 0 0 0 0 $0 0 2010 delta NRC expects to promulgate 3 DCRs over the next 3 years- US-APWR, EPR, ESBWR Section IX.A.2 – Burden covered under 10 CFR 52.99 X.B.1 - COL departures from DC 0 n/a X.B.2 - COL DCD updates X.B.3.c – Burden covered under X.B.1 and X.B.2 Section IX.A.2 – Burden covered under 10 CFR 52.99 X.B.1 X.B.2 X.B.3.c – Burden covered under X.B.1 and X.B.2 X.B.2 X.B.3.c – Burden covered under X.B.1 and X.B.2 1 n/a 0 n/a APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the System 80+ Design Certification Rule over the next 3 years. NRC expects 0 COLs referencing Appendix B under construction over the next 3 years Number of Responses per Total Responses Respondents Respondent Annually Annually Annually n/a n/a n/a 0 1 0 0 n/a Section IX.A.2 – Burden covered under 10 CFR 52.99 X.B.1 APPENDIX A: ABWR DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the ABWR Design Certification Rule over the next 3 years. NRC expects 0 COLs referencing Appendix A under construction over the next 3 years Number of Responses per Total Responses Respondents Respondent Annually Annually Annually n/a n/a n/a 0 1 0 1 n/a 0 n/a APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the AP600 Design Certification Rule over the next 3 years. NRC expects 0 COLs referencing Appendix C under construction over the next 3 years Number of Responses per Total Responses Respondents Respondent Annually Annually Annually n/a n/a n/a 0 1 0 0 n/a 1 n/a 0 n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a 8 n/a 0 n/a $0 500 n/a 0 n/a $0 n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a 8 n/a 0 n/a $0 500 n/a 0 n/a $0 n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a 8 n/a 0 n/a $0 500 n/a 0 n/a $0 n/a Section IX.A.2 – Burden covered under 10 CFR 52.99 X.B.1 APPENDIX D: AP1000 DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the AP1000 Design Certification Rule over the next 3 years. NRC expects 4 COLs referencing Appendix D under construction over the next 3 years Number of Responses per Total Responses Respondents Respondent Annually Annually Annually n/a n/a n/a 4 2 8 X.B.2 X.B.3.c – Burden covered under X.B.1 and X.B.2 Subtotal: Appendices [1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements. 4 n/a 4 1 n/a 4 n/a Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr n/a 8 n/a 64 n/a $17,536 500 n/a 2,000 n/a $548,000 n/a 2,064 0 2,064 $565,536 2010 delta 12 APPENDIX N: STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS: COMBINED LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF IDENTICAL DESIGN AT MULTIPLE SITES NRC expects 0 combined license applicants to use Appendix N over the next 3 years. Section Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $274/hr Paragraph 2 0 0 0 10 0 $0 Paragraph 3 Paragraph 4 – Burden covered under 10 CFR 52.80(c) Subtotal: Appendix N 0 0 0 40 0 $0 0 $0 194,867 191,774 3,093 $53,393,492 Total Part 52 Reporting Burden 0 0 19.6566 1,050 2010 delta TABLE 2 ANNUAL RECORDKEEPING BURDEN 10 CFR PART 52 recordkeepers under 52.63(b)(2) and 52.63(b) are noted as the same record keeper and are only counted once Section Number of Record Burden Hrs. per keepers Record keeper 7/3=2.333 0/3=0 (4/3=1.333) 2.333 500 0 500 52.47 52.57(a)-renewals 52.63(b)(2) 52.63(c) & 52.73(b) 1.333 1.333 1,500 500 Total Annual Burden Hours Estimate Annual Cost @ $274/hr 1,167 0 $319,621 $0 2,000 667 $547,863 $182,621 APPENDIX A: ABWR DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the ABWR Design Certification Rule over the next 3 years. Section Number of Record Burden Hrs. per keepers Record keeper Total Annual Burden Hours Estimate Annual Cost @ $274/hr X.A.1 1 34 34 $9,316 X.A.2 – Burden covered under 10 CFR 50.71(e) X.A.3 – Burden covered under 10 CFR 50.59(d) X.A.4.a - Burden approved under 3150-0210 * X.A.4.b - Burden approved under 3150-0210 * 1 1 1 1 3 3 $822 $822 [1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements. * Burden covered under, U.S Advanced Boiling Water Reactor Aircraft Impact Design Certification Amendment (3150-0210). Following the approval of this renewal, this clearance 3150-0210 will be discontinued. APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the System 80+ Design Certification Rule over the next 3 years. Section Number of Record Burden Hrs. per keepers Record keeper X.A.1 X.A.2 – Burden covered under 10 CFR 50.71(e) X.A.3 – Burden covered under 10 CFR 50.59(d) 1 34 Total Annual Burden Hours Estimate Annual Cost @ $274/hr 34 $9,316 Section 2010 annual burden delta 52.47 666.5 500 52.57(a)-renewals 166.5 -167 52.63(b)(2) 8499 -6,500 52.63(c) & 52.73(b) 2833 -2,167 APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the AP600 Design Certification Rule over the next 3 years. Section Number of Record Burden Hrs. per keepers Record keeper X.A.1 1 Total Annual Burden Hours 34 Estimate Annual Cost @ $274/hr 34 $9,316 X.A.2 – Burden covered under 10 CFR 50.71(e) X.A.3 – Burden covered under 10 CFR 50.59(d) APPENDIX D: AP1000 DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the AP1000 Design Certification Rule over the next 3 years. Section Number of Record Burden Hrs. per keepers Record keeper X.A.1 1 Total Annual Burden Hours 34 Estimate Annual Cost @ $274/hr 34 $9,316 X.A.2 – Burden covered under 10 CFR 50.71(e) X.A.3 – Burden covered under 10 CFR 50.59(d) Total Part 52 Recordkeeping Burden Total Storage Cost 9.666 3,975 $ 10 CFR Part 52 Burden Current Total Number of Respondents: Total Number of Responses: Total Number of Recordkeepers: Total Reporting Burden Hours: Total Recordkeeping Burden Hours: Total Burden Hours: Total Cost: [1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements. 20 1,050 10 194,867 3,975 198,842 $54,482,940 2010 20 67 11 192,830 12,325 205,155 $52,447,321 Delta 0 983.3223 -1 2036.758 -8350.5 (6,313) $2,035,619 $1,089,013 435.61 TABLE 3 ANNUAL REPORTING BURDEN UNDER 10 CFR 52.99(a) 10 CFR PART 52 NOTE: BELLEFONTE, CALLAWAY, NINE MILE, GRAND GULF, RIVER BEND reviews suspended and removed Licensee 2014 2015 South Texas (2 units) N N Vogtle (2 units) A A Lee (2 units) N N Harris (2 units) N N Summer (2 units) A A Levy County (2 units) N N Turkey Point (2 units) N N Calvert Cliffs (1 unit) N N Bell Bend (1 unit) N N North Anna (1 unit) N N Fermi (1 unit) N N Comanche Peak (2 units) N N Total Submittals Model Number of submittals per year per unit Note: N = license not yet issued, A = license issued, Z = initial fuel load Note: Continue ITAAC complete notifications 12 per year until notification of all ITAAC met Note: Assumes that each unit will submit a separate report 0 Year A 0 Year A+1 1 2016 N Z N N A N N N N N N N 0 Year A+2 2 Year Z-1 2 Year Z 12 Year Z+1 12 12 Reviews CY COLA ESP DCA DCR 2014 6 2 4.5 2 Vogtle Summer Start Date 3/30/2012 3/30/2012 52.99[c][1] V1 AP1000 2016 0 0 4.5 0.25 assumed 4 year construction end COLs under construction Total 2015 2.5 1 5 2 3/30/2016 3/30/2016 V2 S3 S4 2014 50 2015 250 2016 600 2017 fuel load 2018 fuel load 100 200 400 200 100 200 400 200 fuel load fuel load 100 200 400 200 900 900 900 900 reports/yr 4 respondents ~900 ITAAC 52.99[c][2] V1 V2 S3 S4 2014 6 6 6 2015 6 6 6 2016 6 6 6 2017 2018 NRC ESTIMATES SIX REPORTS PER LICENSEE PER YEAR OF CONSTRUCTION 6 6 6 reports/yr 4 respondents 52.99 [c][3] Vogtle 3 only potential schedule lag to miss fuel load 1/3=0.333 52.99 [c][4] Vogtle 3 only plant scheduled for 103(g) 1/3=0.333 1000 250 per year 24 6 per year