Information Collection Request

30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan

ICR 201801-1029-003 · OMB 1029-0036 · Active

Forms and Documents
DocumentTypeStatusAvailability
780.30.2018.pdf Supplementary Document Uploaded 2018-03-28 Repair queued
780.60FR.2017.pdf Supplementary Document Uploaded 2018-01-26 Available
780ss.CS.2018.docx Supporting Statement A Uploaded 2018-01-26 Available
30 CFR Part 780e.doc Supplementary Document Uploaded 2012-01-25 Repair queued
Section 522.doc Supplementary Document Uploaded 2008-09-04 Available
Section 515.doc Supplementary Document Uploaded 2008-09-04 Available
Section 510.doc Supplementary Document Uploaded 2008-09-04 Available
Section 508.doc Supplementary Document Uploaded 2008-09-04 Available
Section 507.doc Supplementary Document Uploaded 2008-09-04 Repair queued
IC Document Collections
IC IDCollectionTypeStatusForm
186423 780.38 - Support facilities. (SRAs) Modified
186421 780.38 - Support facilities. (Industry) Modified
186420 780.37 - Road systems. (SRAs) Modified
186419 780.37 - Road systems. (Industry) Modified
186417 780.35 - Disposal of excess spoil. (SRAs) Modified
186415 780.35 - Disposal of excess spoil. (Industry) Modified
186414 780.33 - Relocation or use of public roads. (SRAs) Modified
186413 780.33 - Relocation or use of public roads. (Industry) Modified
186411 780.31 - Protection of publicly owned parks and historic places. (SRAs) Modified
186410 780.31 - Protection of publicly owned parks and historic places. (Industry) Modified
186409 780.29 - Diversions. (SRAs) Modified
186408 780.29 - Diversions. (Industry) Modified
186407 780.27 - Reclamation plan: Surface mining near underground mining. (SRAs) Modified
186406 780.27 - Reclamation plan: Surface mining near underground mining. (Industry) Modified
186405 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (SRAs) Modified
186404 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (Industry) Modified
186403 780.23 - Reclamation plan: Land use information. (SRAs) Modified
186402 780.23 - Reclamation plan: Land use information (Industry) Modified
186401 780.22 - Geologic information. (SRAs) Modified
186400 780.22 - Geologic information. (Industry) Modified
186399 780.21 - Hydrologic information. (SRAs) Modified
186398 780.21 - Hydrologic Information. (Industry) Modified
186397 780.18 - Reclamation plan: General requirements. (SRAs) Modified
186396 780.18 - Reclamation plan: General requirements. (Industry) Modified
186395 780.16 - Fish and wildlife information. (SRAs) Modified
186394 780.16 - Fish and wildlife information. (Industry) Modified
186391 780.14 - Operation plan: Maps and plans. (SRAs) Modified
186390 780.14 - Operation plan: Maps and plans. (Industry) Modified
186388 780.13 - Operation plan: Blasting. (SRAs) Modified
186387 780.13 - Operation plan: Blasting. (Industry) Modified
186386 780.12 - Operation plan: Existing structures. (SRAs) Modified
186385 780.12 - Operation plan: Existing structures. (Industry) Modified
186384 780.11 - Operation plan: General requirements. (SRA) Modified
11283 780.11 - Operation plan: General requirements. (Industry) Modified
ICR Details
1029-0036 201801-1029-003
Active 201411-1029-001
DOI/OSMRE Part 780 - ext.
30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan
Extension without change of a currently approved collection   No
Regular
Approved without change 07/02/2018
Retrieve Notice of Action (NOA) 03/28/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
07/31/2021 36 Months From Approved 06/30/2018
4,101 0 3,956
117,731 0 54,267
1,048,503 0 1,034,231

Permit application requirements in Sections 507, 508, 510, 515 and 522 of PL 95-87 require the applicant to submit the operations and reclamation plans for coal mining activities.

US Code: 30 USC 1201 et seq. Name of Law: The Surface Mining Control and Reclamation Act of 1977
  
None

Not associated with rulemaking

  82 FR 55114 11/20/2017
83 FR 13303 03/28/2018
No

34
IC Title Form No. Form Name
780.27 - Reclamation plan: Surface mining near underground mining. (SRAs)
780.29 - Diversions. (Industry)
780.12 - Operation plan: Existing structures. (Industry)
780.14 - Operation plan: Maps and plans. (SRAs)
780.18 - Reclamation plan: General requirements. (Industry)
780.33 - Relocation or use of public roads. (SRAs)
780.37 - Road systems. (Industry)
780.38 - Support facilities. (SRAs)
780.11 - Operation plan: General requirements. (Industry)
780.22 - Geologic information. (SRAs)
780.13 - Operation plan: Blasting. (SRAs)
780.21 - Hydrologic Information. (Industry)
780.23 - Reclamation plan: Land use information. (SRAs)
780.14 - Operation plan: Maps and plans. (Industry)
780.31 - Protection of publicly owned parks and historic places. (Industry)
780.29 - Diversions. (SRAs)
780.11 - Operation plan: General requirements. (SRA)
780.12 - Operation plan: Existing structures. (SRAs)
780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (Industry)
780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (SRAs)
780.35 - Disposal of excess spoil. (Industry)
780.22 - Geologic information. (Industry)
780.16 - Fish and wildlife information. (Industry)
780.23 - Reclamation plan: Land use information (Industry)
780.16 - Fish and wildlife information. (SRAs)
780.18 - Reclamation plan: General requirements. (SRAs)
780.13 - Operation plan: Blasting. (Industry)
780.21 - Hydrologic information. (SRAs)
780.27 - Reclamation plan: Surface mining near underground mining. (Industry)
780.35 - Disposal of excess spoil. (SRAs)
780.38 - Support facilities. (Industry)
780.33 - Relocation or use of public roads. (Industry)
780.37 - Road systems. (SRAs)
780.31 - Protection of publicly owned parks and historic places. (SRAs)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 4,101 3,956 0 0 145 0
Annual Time Burden (Hours) 117,731 54,267 0 0 63,464 0
Annual Cost Burden (Dollars) 1,048,503 1,034,231 0 0 14,272 0
No
No
For this update, we included information collection required for permit revisions that add acreage to the permit area but are not incidental boundary revisions because we believe it more accurately reflects the burden hours required for applicants and state regulators to comply with information collection required under 30 CFR Part 780. Because of this, the number of responses, both applicants and state regulators, increased under 30 CFR Part 780. In addition, both applicants and state regulators suggested increases to the burden estimates for most of the sections where the collection of information is required. For these reasons, OSMRE is requesting approval for an additional 63,464 hours and $14,272 in non-wage costs.

$68,620
No
    No
    No
No
No
No
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/28/2018