Subpart G - Rig Requirements - 250.710 - 715; 738(p)

30 CFR Part 250, Subpart G, Well Operations and Equipment.

aaa - PRA Statement for eWell as of 10-6-14

Subpart G - Rig Requirements - 250.710 - 715; 738(p)

OMB: 1014-0028

Document [docx]
Download: docx | pdf

PAPERWORK REDUCTION ACT STATEMENT: The Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) requires us to inform you that this information is collected to implement the various environmental provisions of the OCSLA. The information submitted via eWell provides an easier and more reliable reporting method, facilitates better business transactions, and provides for timelier decision making and information dissemination. Responses are mandatory (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. All of the information that can be submitted via eWell is covered under various OMB approved information collections. The information submitted via this system is approved under:


Application/Report

Hour and Non-Hour Cost Burden Per Submission

Regulation and OMB Approved Control Number

Application for Permit to Drill (APD) (BSEE-0123); Revised APD (no fee required); Supplemental APD Information Sheet (BSEE-0123S)

Form takes 1 hour burden; $2,113 non-hour cost burden for each APD. For use under each operation: Subpart D - Drilling,

APD - 2,892.5 hours,

Revised APD - 4.5 hours;

Subpart E - Well-Completions,

APD 22.5 hours, Revised APD - 32 hours;

Subpart G, Well Operations and Equipment, 2.75 hours

Subpart H - Production Safety - APD 3.75 hours;

Subpart P - Sulphur, APD 45 hours.

Throughout 30 CFR 250; 1014-0025.


Application for Permit to Modify (APM) / Revised APM (no fee) (BSEE-0124)

Form takes 1 hour; $125 non-hour cost burden for each APM application. For use under each operation: Subpart E - Well-Completions, 3.83 hours;

Subpart F - Well Workovers, 3.92 hours;

Subpart G, Well Operations and Equipment, 0.40 min.;

Subpart H - Production Safety - 0.83 hour;

Subpart P - Sulphur, 1.16 hours; Subpart Q - Decommissioning, 9.66 hours.

Throughout 30 CFR 250; 1014-0026.

End of Operations Report (EOR) (BSEE-0125)

Form takes 2 hours for casing and cementing; 3 hours for other drilling requirements.

30 CFR 250, Subpart D;

1014-0018.

Well Activity Report (WAR) (BSEE-0133); Open Hole Data Report (Supplement to WAR) (BSEE-0133S)

Each form takes 1 hour, supporting information 2 hours.

Rig Movement Report (BSEEE-0144)

Form takes 0.7 hour.

30 CFR 250, Subpart G; 1014-NEW.

Platform/Rig Evacuation and Production Curtailment Report (BSEE-0132)

1 hour.

30 CFR 250, Subpart A; 1014-0022.

Platform Damage Report; Rig Damage Report; Pipeline Damage Report, (BSEE-0143) (with attached Pipeline Repair Plan)

Form takes 1 hour, supporting documentation 2 hours for initial damage; 1 hour for subsequent; $360 non-hour cost burden for each repair plan.

30 CFR 250, Subparts A and J; 1014-0022 and 1014-0016, respectively.

Incident and Pollution Event Report

1.5 hours for oral notification; 4 hours for follow-up written report.

30 CFR 250, Subpart A, 1014-0022; 30 CFR 254, 1014-0007.

Pollution Report

2 hours.

30 CFR 254, 1014-0007.


Public reporting burden of these requirements include the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the submitted data. To view the most current burden hour of the specific information collection, go to http://www.Reginfo.gov. Direct comments regarding the burden estimate or any other aspect of the this process to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 381 Elden Street, HE3314, Herndon, VA 20170.

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
Authorblundon
File Modified0000-00-00
File Created2021-01-20

© 2024 OMB.report | Privacy Policy