Testing, Evaluation, And Approval Of Mining Products, 30 Cfr Subchapter B - Parts 6 Through 36

OMB 1219-0066

OMB 1219-0066

MSHA regulations at 30 CFR parts 6 through 36 contain application, testing and inspection procedures, and quality control procedures for the approval of mining equipment or explosives used in both underground and surface coal, metal, and nonmetal mines. Except for parts 6 and 7, MSHA conducts most of the testing and evaluation of products for a fee paid by the applicant; although some regulations require the manufacturer to pretest the product. Upon MSHA approval, the manufacturer must ensure that the product continues to conform to the specifications and design evaluated and approved by MSHA. In some instances, as part of the approval process, manufacturers are required to have a quality control or assurance plan.

The latest form for Testing, Evaluation, And Approval Of Mining Products, 30 Cfr Subchapter B - Parts 6 Through 36 expires 2021-07-31 and can be found here.

All Historical Document Collections
Approved without change
Extension without change of a currently approved collection 2024-06-25
Approved without change
Extension without change of a currently approved collection 2021-06-07
Approved without change
Extension without change of a currently approved collection 2018-04-20
Comment filed on proposed rule and continue
Revision of a currently approved collection 2015-09-02
Approved without change
Revision of a currently approved collection 2015-04-02
Preapproved
Revision of a currently approved collection 2014-02-19
Approved without change
Revision of a currently approved collection 2011-08-19
Approved without change
Extension without change of a currently approved collection 2008-07-17
Approved without change
Extension without change of a currently approved collection 2005-07-08
Approved without change
No material or nonsubstantive change to a currently approved collection 2005-06-17
Approved without change
No material or nonsubstantive change to a currently approved collection 2003-08-25
Approved without change
No material or nonsubstantive change to a currently approved collection 2003-08-15
Approved without change
Revision of a currently approved collection 2002-05-29
Approved without change
No material or nonsubstantive change to a currently approved collection 1999-12-28
Approved without change
Extension without change of a currently approved collection 1998-12-22
Approved without change
Reinstatement without change of a previously approved collection 1995-06-30
Approved without change
Reinstatement with change of a previously approved collection 1992-03-16
Approved with change
No material or nonsubstantive change to a currently approved collection 1989-10-01
Approved without change
Revision of a currently approved collection 1988-10-18
Approved without change
Reinstatement with change of a previously approved collection 1988-07-29
Approved without change
Revision of a currently approved collection 1988-02-01
Approved with change
No material or nonsubstantive change to a currently approved collection 1987-11-10
Approved without change
Revision of a currently approved collection 1987-04-08
Approved without change
Revision of a currently approved collection 1986-11-06
Approved with change
No material or nonsubstantive change to a currently approved collection 1986-01-13
Approved without change
Revision of a currently approved collection 1984-04-27
Approved with change
No material or nonsubstantive change to a currently approved collection 1983-05-27
Approved without change
Revision of a currently approved collection 1982-05-25
Approved without change
New collection (Request for a new OMB Control Number) 1981-12-17

© 2024 OMB.report | Privacy Policy